(212) 960-3994Get a Quote
Light grey kitchen with a marble backsplash, built-in ovens and an island with upholstered stools, Manhattan renovation
Google reviews

Upper West Side Apartment Remodeling

Upper West Side apartments are full of charm. They’re also full of layouts that no longer fit modern life: narrow kitchens, bathrooms designed decades ago, and storage that never seems enough. Home Design & Co helps Upper West Side homeowners rework their apartments for today, while respecting the structure, rules, and rhythm of their building.Upper West Side kitchen & bath remodeling, NYC.


Get a free upper west side kitchen and bath remodeling quote

Tell us about your project. A member of our team will be in touch to learn more and discuss the next steps.

Prefer to talk? (212) 960-3994

Why Upper West Side renovations fail without experience

  • Fixed plumbing stacks

    Plumbing risers limit moving toilets, sinks, and drains. Bathroom layouts must follow existing plumbing lines.

  • Outdated electrical systems

    Older wiring often needs upgrades before renovation. Electrical systems must meet modern code and usage needs.

  • Hidden load-bearing walls

    Structural walls may be hidden behind plaster. Proper review is required before altering layouts.

  • Quiet and phased construction rules

    Strict noise limits control renovation schedules. Work must follow approved hours and phases.

Most Upper West Side buildings were built long before modern remodeling standards. We plan around these realities from day one. No guesswork. No redesigns mid-project.

Why homeowners trust Home Design & Co

Upper West Side apartments come with unique renovation demands, especially in pre-war co-ops and condos. Our team manages the approvals, permits, and coordination required to renovate within building rules so your project moves forward without delays or complications.

  • Co-op & condo approval specialist

    We handle board submissions, insurance certificates, and approvals. Direct coordination with building management keeps your project moving.

  • NYC & DOB permit management

    We manage all NYC and Department of Buildings permits. Your renovation stays compliant from filing to final inspection.

  • Dedicated project management

    We coordinate schedules, elevators, deliveries, and debris removal. All work respects your building’s rules and daily operations.

Contemporary kitchen with dark wood tall cabinets, built-in ovens and a stone island

Upper West Side kitchen remodeling

Many Upper West Side homes are pre-war, family-occupied and actively lived in during renovations. Our process focuses on clear sequencing to reduce downtime, dust control and protection, realistic timelines, and daily coordination with building staff. This is not a flip. It’s your home.

Upper West Side kitchens are often enclosed, storage-limited and poorly lit. We redesign them to improve workflow and circulation, cabinet depth and organization, lighting layers, and durability for everyday use.

Kitchen remodeling in Manhattan
Floating white vanity with a chrome faucet and dark floor tile in a renovated Manhattan bathroom

Upper West Side bathroom remodeling

Bathrooms in older Upper West Side buildings demand precision. We prioritize waterproofing systems built for NYC buildings, ventilation upgrades, clean, timeless finishes, and layouts that work within plumbing limits.

Upper West Side co-ops and condos require detailed submissions. We handle drawings and scope documents, insurance certificates, contractor registrations, and coordination with management. You stay informed. We handle the paperwork.

Bathroom remodeling in Manhattan

See your kitchen before we build it

Every project opens with a one-on-one design session. We measure, listen to how you actually use the space, and produce detailed 3D renderings so you can walk the layout before anything is ordered or demolished.

Line-item estimates, no moving numbers: every line is priced and explained up front, so the number you approve is the number you pay. Our portfolio and Instagram show photographs of completed NYC remodels, never stock imagery or invented before-and-afters.

Itemized estimateEvery line explained
  • Scope of workItemized
  • 3D design packageItemized
  • Cabinetry and millworkItemized
  • Stone and tileItemized
  • Plumbing and electricalItemized
  • Permits and building filingsItemized
  • Project managementItemized

Illustration of how an estimate is organized. Your quote lists real figures for your project.

What our clients say

4.9 on Google · 59 reviews

Renovating inside Manhattan’s most selective buildings

Every neighborhood has its own boards, riser lines and work hours. Pick yours.

Also serving West Village, Gramercy, Chelsea, Tribeca and SoHo. Call and we will tell you what to expect in your building.

Let’s talk about your apartment

If you’re planning an Upper West Side renovation, start with clarity. We’ll evaluate your space, your building, and your goals before recommending solutions.

  • Deep experience in pre-war Manhattan buildings
  • Licensed and fully insured NYC contractor
  • Design-first planning to avoid surprises
  • Respectful crews and clean job sites